Urge Pause

Free · Windows 10/11 · runs entirely offline

Notice the loop while you’re still in it.

Urge Pause sits quietly in your system tray, notices compulsive checking as it happens, and interrupts with a calm pause. Everything stays on your device.

No account. No cloud. No telemetry.

The pause, recreated live. In the app, it fills your screen.

What it catches

Four families. You control every one.

Windows & pages

On by default
  • Repeated checking
  • Quick glances
  • Tab bouncing

Anything on your Ignore list is left completely alone.

Keyboard

Opt-in · off by default
  • Repeated key
  • Type-delete-retype
  • Refresh storms — F5 · Ctrl+R
  • Your own patterns

Resets to off on every launch. Keystrokes are never stored.

Mouse

Opt-in · off by default
  • Click mashing
  • Re-click checking
  • Menu checking

Resets to off on every launch. Click contents are never stored.

“I caught myself”

Manual
  • Ctrl+Alt+R, anywhere
  • Urge rating 1–5
  • Optional note

Log a catch the app didn’t see. Kept in its own series — see the dashboard.

Every detector’s sensitivity is adjustable — tune it to your actual habits.

How it works

Notice. Pause. Choose. Learn.

Notice

It watches window and page switching in real time — locally, on your device.

Pause

A full-screen breathing ring counts down while the specific pattern is named.

Choose

Acknowledge and continue — rate the urge 1–5 if you’ve turned that on. A false-alarm escape exists, with guardrails.

Learn

Every event becomes local data: trends, triggers, exportable reports.

Awareness

A heads-up you can dismiss instantly.

Friction Default

A fixed pause — 15 seconds — then continue.

Hard Block

An escalating pause that eases as you stay calm.

Urge Pause’s full-screen pause from the current build: a soft blue breathing ring counting down from 15 on a near-black screen, the pattern line ‘You’ve checked Gmail — Inbox 5 times in the last 2 minutes’, and a false-alarm link at the bottom.
The pause, from the current build. Window-and-page messages are templates you can rewrite in your own words.

The dashboard

See the pattern you’ve been inside.

Urge Pause dashboard: cards for resisted today against a goal of 5, longest calm stretch, and this week’s total; a stacked bar chart of resistance over time by detection type; a time-of-day breakdown; and top triggers including mail.google.com.
The dashboard, current build — with the “Include self-reports” toggle at the chart’s foot.
  • Today Resists vs your daily goal, longest calm stretch.
  • Trends Resistance over 7, 30, or 90 days — by type, total, or urge.
  • When Time-of-day breakdown.
  • Where The specific sites and apps that fire most.
  • Log A per-day list of each event, with urge ratings — and your note on the ones you caught yourself.
  • Streak Good days — at or under your goal — add up.

For clinicians

What this tool is — stated plainly.

If a client brings Urge Pause data to a session, here is what it measures, how it exports, and what it does not claim.

What the data is

Counts, timestamps, and the window title or web address involved (domain and page path) — never page content or messages. Events can carry a client-entered urge rating (1–5); self-caught events can carry a note.

Self-reported catches are recorded as a separate series, not mixed into app-detected trends unless deliberately included.

How it exports

PDF report or CSV, from the app’s Privacy tab, over 1 week to all time. When self-catches exist, trend charts appear twice — app-detected only, and combined.

Per-event rows with notes export in the CSV. Built to be handed across a desk.

What it does not claim

A self-monitoring tool — not a medical device, not a treatment, no diagnosis. It can support ERP homework: a built-in delay between urge and action, and an urge-intensity record over time.

The exported Urge Pause progress report: summary tiles — times resisted, active days, average urge, longest streak — above two resistance-over-time charts labeled ‘App-detected only’ and ‘Including your self-catches’.
The exported report — the two series charted separately, never conflated.

Privacy

Private by architecture, not by policy.

Urge Pause has no server. These aren’t promises — they’re properties of the software.

Local only

Runs entirely on your PC. No account, no sign-up, no cloud.

No network calls

No telemetry, no analytics. There is nowhere to send anything.

What’s recorded

Counts, timestamps, window titles and web addresses (like mail.google.com/inbox), your ratings and notes. Never page content.

Matched in memory

Opted-in keyboard and mouse patterns never store keystrokes — only “a pattern fired.”

Off means off

Keyboard and mouse watching reset to off on every launch. Opting back in is always a conscious choice.

You export, or nothing leaves

Data leaves your machine only as a PDF or CSV you create yourself.

Events live in a local SQLite database and age out on a schedule you choose — 7, 30, or 90 days, or kept forever. Daily summaries survive, so trends remain.

Download

Download Urge Pause.

  • Free
  • Windows 10/11 (64-bit)
  • Version 5.2.3
  • No admin rights needed
Download for Windows

Urge.Pause.Setup.5.2.3.exe · 93 MB

  1. Download the installer and run it — it installs at user level.
  2. If Windows SmartScreen appears, click More info, then Run anyway.
  3. Look for the ring in your system tray — it’s running. Relaunch the app any time to open the dashboard.

By installing, you agree to the license · Terms & Privacy

FAQ

Fair questions.

Is this therapy?

No. Urge Pause is a self-monitoring tool — it can support therapy, like ERP homework, but it doesn’t provide it. If you’re struggling, please reach out to a qualified clinician; the International OCD Foundation keeps a directory at iocdf.org.

What exactly does it record?

Counts, timestamps, window titles and web addresses (domain and page path, like mail.google.com/inbox), optional urge ratings (1–5), and your own notes. Never page content, messages, or keystrokes.

Does anything leave my computer?

No. There are no network calls and no server. Data leaves only when you export a PDF or CSV yourself.

What if it fires and it wasn’t a compulsion?

Use the false-alarm escape. After several dismissals in an hour — or of the same page — it gently gives way to “let’s sit with this one.” Nothing is ever auto-ignored, and every detector’s sensitivity is adjustable.

What does it cost?

Nothing — it’s a free download for Windows 10/11. An on-device AI tier ($2.99/month) is planned but not available today.